CAF announces the first edition of the Latin American and Caribbean Economic Forum 2025 in Panama
December 20, 2024
A series of road re-structurings and works is on-going, to provide a more efficient use of public transportation that responds to the demand. The efforts will be carried out in infrastructure and public-private coordination.
August 09, 2013
The population that the re-structuring of the public transportation traditional scheme expects to serve exceed 250 thousand users, equivalent to the total demand of the city's demand for transportation.
The works, at their initial stage, include the improvement of 33.17 kms. of roads; adaptation of the public space, specially platforms, construction of pedestrian and vehicular bridges, and vehicular interchanges to speed up traffic and mitigate accidents in high risk crossings.
As part of the re-structuring, the construction of decentralized centers for public proceedings has been suggested, aimed at easing congestion in the city's center, which is the main destination of trips .A center to control traffic lights and the fleet will be included during the System's operation stage.
CAF finances USD 70 million for the implementation of the Strategic Public Transportation System in Monteria, connecting the private sector through the operation of at least two bus companies and one collector and technological integrator operator for the control and management systems.
The Urban Transportation Program, developed by CAF, is recognized as a scheme that responds to the characteristics and distinctive features of mobility and urban structuring. In the case of Monteria, the Program will improve the population's mobility conditions with efficient planning, construction, management, regulation, and control schemes, in addition to being sustainable in operating, environmental, and financial terms
December 20, 2024
December 10, 2024
December 09, 2024